BLOG / DEVELOPMENT BLOG 2026
DEVELOPMENTBLOG2026
Milestone-by-milestone from dry-dock to full-system pool operations: how software, electrical, and mechanical came together across the spring wet tests.

TESTING
Spring 2026 Wet Tests: From Dry-Dock to Pool Operations
A look back at how the team moved from dry-dock development into real pool operations, transforming coordination across software, electrical, and mechanical along the way.
June 20266 min readREAD

BUILD LOG
Barracuda Build Update: What We Changed for RoboSub 2025
A look at the latest structural, software, and electrical upgrades that are shaping our 2025 vehicle.
May 20266 min readREAD